• Kiesol Standard

    Article No. 031069

    Kiesol Standard

    Brochures

    product.brochures.loading

    Product specifications

    The stated values represent typical product characteristics and are not to be construed as binding product specifications.

    Field of application

    • For use on floors/walls indoors and outdoors
    • Porous, mineral building materials such as fired and sand-lime brick, sandstone, mineral renders
    • Subsequent horizontal waterproofing of masonry under gravity up to a degree of moisture penetration of 80%
    • Subsequent horizontal waterproofing of masonry under low pressure up to a degree of moisture penetration of 95%
    • Priming for protection against rear moisture penetration
    • Surface improvement

    Properties

    • Water-based
    • Strengthens
    • Narrows pores
    • Repels water
    • Improves adhesion, abrasion resistance and surface strength
    • Increases resistance to chemical attack
    • Preparation
      • Substrate requirements

         

        Subsequent horizontal waterproofing of masonry

        Drilling channel must be free of drill dust.

        Priming for protection against the effect of water from behind

        The substrate must be clean and free of oil, grease and release agents.

        Surface improvement

        The substrate must be clean and free of oil, grease and release agents.

      • Preparations

        For injection in a low-pressure procedure, the wall surface must be plugged with Kiesol and waterproofing slurry to at least 30 cm above and below the row of boreholes.

         

        Subsequent horizontal waterproofing of masonry

        Production of boreholes:

        Diameter 12 - 30 mm, spacing 10 - 12.5 cm, angle of inclination approx. 45°, borehole depth up to approx. 5 cm from end of wall.

        For walls > 0.6 m thick, it is recommended to make the series of drill holes on both sides.

        Pre-inject BSP 3 or BSP 6 (borehole suspension) into hollow masonry.

        Wait 7 days before carrying out further work.

        Re-pierce filled boreholes after incipient hardening of the BSP.

    • Application
      • Application temperature: min. 5 °C max. 35 °C
      • By brush/ Bore hole saturation / Pressure injection / Low pressure spraying
      • Subsequent horizontal waterproofing of masonry

        - Under gravity (moisture penetration < 80%):

        Using a suitable vessel, e.g. Kiesol Metering Cartridge (417301), fill (multiple times if necessary) until saturated.

        - Low pressure (moisture penetration < 95%):

        Inject using suitable injection equipment and injection packers.

         

        Priming for protection against the effect of water from behind

        Apply the material in sections, under gravity and without misting in the flow coating procedure, horizontally from top to bottom.

         

        Surface improvement

        Apply the material in sections, under gravity and without misting in the flow coating procedure, horizontally from top to bottom.

        Repeat the procedure (wet-on-wet) until no more material uptake is observed.

    • Application instructions
      • Take appropriate measures to protect adjacent building elements and materials that should not come into contact with the product.

         

        Subsequent horizontal waterproofing of masonry

        After injection, fill the boreholes with borehole suspension.

        Then, apply surface waterproofing to at least 30 cm above and below the row of drill holes. Include adjacent components if necessary.

        Not suitable for injections in porous concrete, gypsum and clay building materials.

         

        Priming for protection against the effect of water from behind

        Immediately remove excess product.

        Perform subsequent operations wet-on-wet, within the reaction time.

         

        Surface improvement

        Protect freshly treated surfaces from driving rain, wind, sunlight and condensation.

        Not suitable for improving surfaces where higher requirements are placed on appearance.

    • Working tools / cleaning
      • By brush/ Bore hole saturation / Pressure injection / Low pressure spraying
      • Clean tools immediately after use with water.

        Ensure that any residue from cleaning is disposed of correctly.

    • Storage / shelf life
      • Store frost-free and cool / protect for moisture / close containers
      • Shelf-life 24 months
      • If stored unopened in its original container in a cool, dry place and protected against frost, the product will keep for at least 24 months.

    • General information
      • The relevant test certificates must be observed when planning and carrying out work.

        The applicable regulations and legal requirements must be observed.

        Information on planning injection processes with and processing certified injection materials against capillary moisture transport can be found in WTA Code of Practice 4-10 and must be taken into account.

    • Disposal instructions
      • Larger quantities of leftover product should be disposed of in the original containers in accordance with the applicable regulations. Completely empty, clean containers should be recycled. Do not dispose of together with household waste. Do not allow to enter the sewage system. Do not empty into drains.

    • Safety / regulations
      • For further information on the safety aspects of transporting, storing and handling the product and on disposal and environmental matters, please see the current Safety Data Sheet.